Projects

Case studies

Four real projects, told without client names. What matters is the problem behind each one and how it was solved.

Automotive, integrated logistics

Stabilizing sequencing processes at a truck plant

Context

We were brought in as a supplier of production materials. During the assessment we found critical failures in the triple-sequencing process: every engine and component had to arrive in exact order, with its serial number matched to the corresponding truck.

The challenge

  • Unstable processes
  • Sequencing errors
  • Components pulled from the line on an urgent basis
  • Unquantified costs
  • Reactive logistics

Solution and results

  • Redesign of the sequencing process
  • Logistics integrated across production and warehouse
  • Cost control per component and per urgent request
  • Stable, repeatable process, zero sequencing stoppages

Key value: optimizing critical processes without stopping production.

Automotive, resilience

Operational continuity during the global chip shortage

Context

With the global shortage of microchips and components sourced from Asia, the client's logistics were severely disrupted. The plant was at risk of shutting down or releasing incomplete units.

The challenge

  • Shortage of critical components
  • International logistics at a standstill
  • Incomplete trucks due to urgent pulls
  • High risk of a full shutdown

Solution and results

  • Reorganized logistics flow
  • Prioritization of critical components
  • In-house solutions to reduce external dependency
  • Continuous production, zero incomplete units

Key value: operational resilience during global crises.

Industrial equipment, costs

Reducing costs and urgent logistics requests

Context

A global industrial equipment manufacturer contacted us about a critical issue: the cost of pulling components off the production line. They needed to understand the real impact of every urgent decision.

The challenge

  • No visibility into real costs
  • Hidden costs from energy, freight and expedited logistics
  • Operating decisions made without clear financial data

Solution and results

  • End-to-end process analysis
  • Real cost quantified per urgent request
  • Critical points identified
  • Full visibility of the financial impact, fewer unnecessary urgent requests

Key value: real data for strategic decisions.

Industrial project, turnkey

Full infrastructure and integration without disrupting live production

Context

The client needed to bring new operating areas online while production kept running. Everything had to be delivered ready to operate.

The challenge

  • Fluids, oils and gases
  • Pits, sumps and pumps
  • Exhaust gas and carbon monoxide extraction
  • Electrical and industrial infrastructure
  • Offices, network, internet and access control
  • Shipping and receiving areas

Solution and results

  • Complete project design
  • Coordination of multiple technical disciplines
  • Delivered under a turnkey model
  • Immediate operation, scalable infrastructure, zero impact on production

Key value: one integrator, one complete solution.